Project status

  • Holding information
  • Active information
  • Closed for comments
  • Planning submitted
  • Planning decision
  • In construction

Welcome to
Pelham Spring Solar Farm

Low Carbon is proposing a solar farm, to be known as Pelham Spring Solar Farm, located on land near Pelham Substation, between the parishes of Manuden and Berden. The project will generate approximately 49.9 megawatts (MW), producing enough clean renewable energy to cover the annual electrical consumption of approximately 16,500 homes each year.

Contact us:

Email: info@pelhamsolarfarm.co.uk

  • Project Status

    Planning submitted

  • Site address

    Land near Pelham Substation

Pelham Spring Solar Farm

Low Carbon is seeking planning permission from the Planning Inspectorate in its capacity as the Determining Authority for major applications within Uttlesford District Council following the Council's designation under special measures in February 2022.

The proposal is for the construction and operation of a renewable energy project along with the infrastructure needed to export the electricity it generates to the local network operator, UK Power Networks.

Pelham Spring Solar Farm, is located on land to the south of Berden and to the north-west of Manuden. The project will generate approximately 49.9 megawatts (MW), producing enough clean renewable energy to cover the annual electrical consumption of approximately 16,500 homes each year.

The solar farm, co-located with battery storage will contribute to supporting our transition to a low carbon energy system while securing the energy needs for Great Britain whilst helping to reach our commitment of net zero carbon emissions by 2050.

Pelham Spring Solar Farm is proposed for a period of 40 years, after which the modules would be decommissioned and removed from the land and as many items will be recycled or re-purposed as possible.

Timeline

  1. December 2020 - January 2021

    Pre-Planning Council Consultation

    Completed 2021-01-18
  2. February - August 2021

    EIA Screening & Parish Consultation

    Completed 2021-08-09
  3. March - August 2021

    Community Consultation

    Completed 2021-08-09
  4. November 2021

    Planning application submission to Uttlesford District Council

    Completed 2021-11-09
  5. September 2022

    Planning application submission to Planning Inspectorate

    Completed 2022-10-05
  1. Autumn 2022 - Spring 2023

    Planning Inspectorate will consider and determine the application

  2. Spring/Summer 2024

    Commencement of Construction (if planning permission is granted)

  1. Completed
    2021-01-18
  2. Completed
    2021-08-09
  3. Completed
    2021-08-09
  4. Completed
    2021-11-09
  5. Completed
    2022-10-05

Key Project Documents

In this section, you will find key information about the project which you able to download and view or print at home.

  • Environmental Statement

    This Environmental Statement has been managed and coordinated by Pegasus Group on behalf of Low Carbon Solar Park 6 Limited (“The Applicant”). The Environmental Statement has been prepared to support a planning application submitted to The Planning Inspectorate on behalf of the Secretary of State under the provisions of Section 62A of the Town and Country Planning Act 1990.

    Download
  • Environmental Statement Technical Appendices

    Download
  • Construction Traffic Management Plan

    Download
  • Design and Access Statement

    Download