Low Carbon is seeking planning permission from the Planning Inspectorate in its capacity as the Determining Authority for major applications within Uttlesford District Council following the Council's designation under special measures in February 2022.
The proposal is for the construction and operation of a renewable energy project along with the infrastructure needed to export the electricity it generates to the local network operator, UK Power Networks.
Pelham Spring Solar Farm, is located on land to the south of Berden and to the north-west of Manuden. The project will generate approximately 49.9 megawatts (MW), producing enough clean renewable energy to cover the annual electrical consumption of approximately 16,500 homes each year.
The solar farm, co-located with battery storage will contribute to supporting our transition to a low carbon energy system while securing the energy needs for Great Britain whilst helping to reach our commitment of net zero carbon emissions by 2050.
Pelham Spring Solar Farm is proposed for a period of 40 years, after which the modules would be decommissioned and removed from the land and as many items will be recycled or re-purposed as possible.